Skip to main content

Basement conversion, kitchen side extension and loft extension in Wandsworth

If a project needed everything it would be this one. With a strict timescale of 7 months from start to move in date this project needed careful planning to ensure timescales and budgets were met. The whole property was redesigned from ground floor up to provide an exceptional living space with 5 ensuite bedrooms including accommodation for a nanny. The ground floor space was again opened up to provide an open living area. A shaker style real oak kitchen was installed with designer Elicia extractor hoods and De Dietrich ovens and hobs.